Inspection Request Form

Preferred time of inspection
Inspection Requested
Prior to placing any concrete, forming & reinforcement complete. P.Eng. reports required.
Prior to placing any concrete, forming & reinforcement complete. P.Eng. reports required.
Trenches and works inspected by Building Dept to property line. *Municipal connections: inspected by the Operations Dept. Make requests to operations@peachland.ca. Allow up to 2 business days.
Trenches and works inspected by Building Dept to property line. *Municipal connections: inspected by the Operations Dept. Make requests to operations@peachland.ca. Allow up to 2 business days.
All tests must be on & plumbing contractor on site.
Dampproofing and drain tile complete, survey certificate required.
Drainage and water lines: all tests must be on & plumbing contractor on site.
All electrical/mechanical, back framing, fire-blocking work complete. Windows and roofing installed. Sealed truss specs. P.Eng. field reports, mechanical ventilation checklist required.
All exterior framing complete with doors/windows installed, and if required, P.Eng. acceptance.
Provide blower door test results; fire-stopping must be complete.
Only request when ready operations@peachland.ca. Allow up to 2 business days.
All work must be complete. Conditional or provisional occupancy NOT available. Final plumbing must be accepted. Schedule C-B's, Insulation Installer Certificate and CEA reports required.